Scheduling
and Use
The first important thing for
a good flooring it’s the type
of concrete that is used. It’s
very important that the concrete has
a good quality, for example a concrete
Rck 25 (to resistance).
- The concrete it must have the
minimal thickness of approximately
10 cm in which they will come
employed beyond to the metal net
some fibers in polypropylene in
the amount of a bag from 0,9 kg.
for mc in a position to rendering
it more resistant and compact
and eliminating for 80% the little
crackes
- Once executed the jet of the
concrete to quota ended floor,
it happens the dust of Color Hardener
DS-H, the confections are in vase
from kg.25, which goes used in
one medium amount of 3 Kg. to
the mq, passed more times on the
concrete to coolness, so as to
to color definitively the surface
that will come smoothed down and
finished off with appropriate
tools.
- When the concrete begins to
harden itself, it is proceeded
in the drawing up to dust of Release
Agent DS-R, which it will come
used in the amount of 0,126 Kg.
for mq., a vase of kg.12,6 is
necessary for approximately mq.
100, such product beyond holding
separate the concrete from the
stamps, it will create "an antique
effect” on the surface previously
colored.
- The phase of the stamping will
happen in the moment in which
the concrete it will have caught
up the just compactness and it
will be able to support the weight
of the operator. To print they
generally use ten hard stamps
and two softnes, these last ones
were used to print in the more
difficult points like the angles
and against the walls.
- The washing of the floor happens
with water to pressure, it could
be carried out a day after if
the season is warm, two, three
days after if the season is colder.
- The last phase of job demands
the employment of Resin DS-CS
(ClearSealer), it’s hardly
the floor is dry it can spread
one first hand, but it can be
employed also after more days.
The resin can be spread with roller
or Airless pump, in two hands
and it is dried up fastly, above
all in presence of a warm climate,
a Vase from Lt. 20 is sufficient
for approximately 100 mq.
The paving to this point cannot
be used in order at least 24 hours.
Means
for realization
Our paving printed can be
realize with one square composed by
three operators.
A square with little experience can
realize approximately 70 mq. to the
day, an expert square can realize
from the 100 to the 130 mq. to the
day, executing the working phases
1-2-3-4 over cited.
Once realized all the paving (that
is jet of the concrete, coloration
and stamping), it is passed to over
cited phase 5, that is that one of
the washing of the printed paving,
in which two single operators with
water to pressure succeed to clean
up approximately 800 mq. to the day.
The point 6 over cited comes executed
from a single operator, that with
a Airless can give the resin in approximately
1000 mq. to the paving day.
Maintenance
It’s enough to wash
the floor again and when dry, protect
it with DS-CS transparent resin. This
maintenance must be done after some
years or more according to the bearing
traffic. To obtain a floor that lasts
for years we recommend to use just
”Design Systems” products,
skilled labour and high quality concrete.
|